|
@@ -0,0 +1,281 @@
|
|
|
+ Deadline Task Scheduling
|
|
|
+ ------------------------
|
|
|
+
|
|
|
+CONTENTS
|
|
|
+========
|
|
|
+
|
|
|
+ 0. WARNING
|
|
|
+ 1. Overview
|
|
|
+ 2. Scheduling algorithm
|
|
|
+ 3. Scheduling Real-Time Tasks
|
|
|
+ 4. Bandwidth management
|
|
|
+ 4.1 System-wide settings
|
|
|
+ 4.2 Task interface
|
|
|
+ 4.3 Default behavior
|
|
|
+ 5. Tasks CPU affinity
|
|
|
+ 5.1 SCHED_DEADLINE and cpusets HOWTO
|
|
|
+ 6. Future plans
|
|
|
+
|
|
|
+
|
|
|
+0. WARNING
|
|
|
+==========
|
|
|
+
|
|
|
+ Fiddling with these settings can result in an unpredictable or even unstable
|
|
|
+ system behavior. As for -rt (group) scheduling, it is assumed that root users
|
|
|
+ know what they're doing.
|
|
|
+
|
|
|
+
|
|
|
+1. Overview
|
|
|
+===========
|
|
|
+
|
|
|
+ The SCHED_DEADLINE policy contained inside the sched_dl scheduling class is
|
|
|
+ basically an implementation of the Earliest Deadline First (EDF) scheduling
|
|
|
+ algorithm, augmented with a mechanism (called Constant Bandwidth Server, CBS)
|
|
|
+ that makes it possible to isolate the behavior of tasks between each other.
|
|
|
+
|
|
|
+
|
|
|
+2. Scheduling algorithm
|
|
|
+==================
|
|
|
+
|
|
|
+ SCHED_DEADLINE uses three parameters, named "runtime", "period", and
|
|
|
+ "deadline" to schedule tasks. A SCHED_DEADLINE task is guaranteed to receive
|
|
|
+ "runtime" microseconds of execution time every "period" microseconds, and
|
|
|
+ these "runtime" microseconds are available within "deadline" microseconds
|
|
|
+ from the beginning of the period. In order to implement this behaviour,
|
|
|
+ every time the task wakes up, the scheduler computes a "scheduling deadline"
|
|
|
+ consistent with the guarantee (using the CBS[2,3] algorithm). Tasks are then
|
|
|
+ scheduled using EDF[1] on these scheduling deadlines (the task with the
|
|
|
+ smallest scheduling deadline is selected for execution). Notice that this
|
|
|
+ guaranteed is respected if a proper "admission control" strategy (see Section
|
|
|
+ "4. Bandwidth management") is used.
|
|
|
+
|
|
|
+ Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so
|
|
|
+ that each task runs for at most its runtime every period, avoiding any
|
|
|
+ interference between different tasks (bandwidth isolation), while the EDF[1]
|
|
|
+ algorithm selects the task with the smallest scheduling deadline as the one
|
|
|
+ to be executed first. Thanks to this feature, also tasks that do not
|
|
|
+ strictly comply with the "traditional" real-time task model (see Section 3)
|
|
|
+ can effectively use the new policy.
|
|
|
+
|
|
|
+ In more details, the CBS algorithm assigns scheduling deadlines to
|
|
|
+ tasks in the following way:
|
|
|
+
|
|
|
+ - Each SCHED_DEADLINE task is characterised by the "runtime",
|
|
|
+ "deadline", and "period" parameters;
|
|
|
+
|
|
|
+ - The state of the task is described by a "scheduling deadline", and
|
|
|
+ a "current runtime". These two parameters are initially set to 0;
|
|
|
+
|
|
|
+ - When a SCHED_DEADLINE task wakes up (becomes ready for execution),
|
|
|
+ the scheduler checks if
|
|
|
+
|
|
|
+ current runtime runtime
|
|
|
+ ---------------------------------- > ----------------
|
|
|
+ scheduling deadline - current time period
|
|
|
+
|
|
|
+ then, if the scheduling deadline is smaller than the current time, or
|
|
|
+ this condition is verified, the scheduling deadline and the
|
|
|
+ current budget are re-initialised as
|
|
|
+
|
|
|
+ scheduling deadline = current time + deadline
|
|
|
+ current runtime = runtime
|
|
|
+
|
|
|
+ otherwise, the scheduling deadline and the current runtime are
|
|
|
+ left unchanged;
|
|
|
+
|
|
|
+ - When a SCHED_DEADLINE task executes for an amount of time t, its
|
|
|
+ current runtime is decreased as
|
|
|
+
|
|
|
+ current runtime = current runtime - t
|
|
|
+
|
|
|
+ (technically, the runtime is decreased at every tick, or when the
|
|
|
+ task is descheduled / preempted);
|
|
|
+
|
|
|
+ - When the current runtime becomes less or equal than 0, the task is
|
|
|
+ said to be "throttled" (also known as "depleted" in real-time literature)
|
|
|
+ and cannot be scheduled until its scheduling deadline. The "replenishment
|
|
|
+ time" for this task (see next item) is set to be equal to the current
|
|
|
+ value of the scheduling deadline;
|
|
|
+
|
|
|
+ - When the current time is equal to the replenishment time of a
|
|
|
+ throttled task, the scheduling deadline and the current runtime are
|
|
|
+ updated as
|
|
|
+
|
|
|
+ scheduling deadline = scheduling deadline + period
|
|
|
+ current runtime = current runtime + runtime
|
|
|
+
|
|
|
+
|
|
|
+3. Scheduling Real-Time Tasks
|
|
|
+=============================
|
|
|
+
|
|
|
+ * BIG FAT WARNING ******************************************************
|
|
|
+ *
|
|
|
+ * This section contains a (not-thorough) summary on classical deadline
|
|
|
+ * scheduling theory, and how it applies to SCHED_DEADLINE.
|
|
|
+ * The reader can "safely" skip to Section 4 if only interested in seeing
|
|
|
+ * how the scheduling policy can be used. Anyway, we strongly recommend
|
|
|
+ * to come back here and continue reading (once the urge for testing is
|
|
|
+ * satisfied :P) to be sure of fully understanding all technical details.
|
|
|
+ ************************************************************************
|
|
|
+
|
|
|
+ There are no limitations on what kind of task can exploit this new
|
|
|
+ scheduling discipline, even if it must be said that it is particularly
|
|
|
+ suited for periodic or sporadic real-time tasks that need guarantees on their
|
|
|
+ timing behavior, e.g., multimedia, streaming, control applications, etc.
|
|
|
+
|
|
|
+ A typical real-time task is composed of a repetition of computation phases
|
|
|
+ (task instances, or jobs) which are activated on a periodic or sporadic
|
|
|
+ fashion.
|
|
|
+ Each job J_j (where J_j is the j^th job of the task) is characterised by an
|
|
|
+ arrival time r_j (the time when the job starts), an amount of computation
|
|
|
+ time c_j needed to finish the job, and a job absolute deadline d_j, which
|
|
|
+ is the time within which the job should be finished. The maximum execution
|
|
|
+ time max_j{c_j} is called "Worst Case Execution Time" (WCET) for the task.
|
|
|
+ A real-time task can be periodic with period P if r_{j+1} = r_j + P, or
|
|
|
+ sporadic with minimum inter-arrival time P is r_{j+1} >= r_j + P. Finally,
|
|
|
+ d_j = r_j + D, where D is the task's relative deadline.
|
|
|
+
|
|
|
+ SCHED_DEADLINE can be used to schedule real-time tasks guaranteeing that
|
|
|
+ the jobs' deadlines of a task are respected. In order to do this, a task
|
|
|
+ must be scheduled by setting:
|
|
|
+
|
|
|
+ - runtime >= WCET
|
|
|
+ - deadline = D
|
|
|
+ - period <= P
|
|
|
+
|
|
|
+ IOW, if runtime >= WCET and if period is >= P, then the scheduling deadlines
|
|
|
+ and the absolute deadlines (d_j) coincide, so a proper admission control
|
|
|
+ allows to respect the jobs' absolute deadlines for this task (this is what is
|
|
|
+ called "hard schedulability property" and is an extension of Lemma 1 of [2]).
|
|
|
+
|
|
|
+ References:
|
|
|
+ 1 - C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogram-
|
|
|
+ ming in a hard-real-time environment. Journal of the Association for
|
|
|
+ Computing Machinery, 20(1), 1973.
|
|
|
+ 2 - L. Abeni , G. Buttazzo. Integrating Multimedia Applications in Hard
|
|
|
+ Real-Time Systems. Proceedings of the 19th IEEE Real-time Systems
|
|
|
+ Symposium, 1998. http://retis.sssup.it/~giorgio/paps/1998/rtss98-cbs.pdf
|
|
|
+ 3 - L. Abeni. Server Mechanisms for Multimedia Applications. ReTiS Lab
|
|
|
+ Technical Report. http://xoomer.virgilio.it/lucabe72/pubs/tr-98-01.ps
|
|
|
+
|
|
|
+4. Bandwidth management
|
|
|
+=======================
|
|
|
+
|
|
|
+ In order for the -deadline scheduling to be effective and useful, it is
|
|
|
+ important to have some method to keep the allocation of the available CPU
|
|
|
+ bandwidth to the tasks under control.
|
|
|
+ This is usually called "admission control" and if it is not performed at all,
|
|
|
+ no guarantee can be given on the actual scheduling of the -deadline tasks.
|
|
|
+
|
|
|
+ Since when RT-throttling has been introduced each task group has a bandwidth
|
|
|
+ associated, calculated as a certain amount of runtime over a period.
|
|
|
+ Moreover, to make it possible to manipulate such bandwidth, readable/writable
|
|
|
+ controls have been added to both procfs (for system wide settings) and cgroupfs
|
|
|
+ (for per-group settings).
|
|
|
+ Therefore, the same interface is being used for controlling the bandwidth
|
|
|
+ distrubution to -deadline tasks.
|
|
|
+
|
|
|
+ However, more discussion is needed in order to figure out how we want to manage
|
|
|
+ SCHED_DEADLINE bandwidth at the task group level. Therefore, SCHED_DEADLINE
|
|
|
+ uses (for now) a less sophisticated, but actually very sensible, mechanism to
|
|
|
+ ensure that a certain utilization cap is not overcome per each root_domain.
|
|
|
+
|
|
|
+ Another main difference between deadline bandwidth management and RT-throttling
|
|
|
+ is that -deadline tasks have bandwidth on their own (while -rt ones don't!),
|
|
|
+ and thus we don't need an higher level throttling mechanism to enforce the
|
|
|
+ desired bandwidth.
|
|
|
+
|
|
|
+4.1 System wide settings
|
|
|
+------------------------
|
|
|
+
|
|
|
+ The system wide settings are configured under the /proc virtual file system.
|
|
|
+
|
|
|
+ For now the -rt knobs are used for dl admission control and the -deadline
|
|
|
+ runtime is accounted against the -rt runtime. We realise that this isn't
|
|
|
+ entirely desirable; however, it is better to have a small interface for now,
|
|
|
+ and be able to change it easily later. The ideal situation (see 5.) is to run
|
|
|
+ -rt tasks from a -deadline server; in which case the -rt bandwidth is a direct
|
|
|
+ subset of dl_bw.
|
|
|
+
|
|
|
+ This means that, for a root_domain comprising M CPUs, -deadline tasks
|
|
|
+ can be created while the sum of their bandwidths stays below:
|
|
|
+
|
|
|
+ M * (sched_rt_runtime_us / sched_rt_period_us)
|
|
|
+
|
|
|
+ It is also possible to disable this bandwidth management logic, and
|
|
|
+ be thus free of oversubscribing the system up to any arbitrary level.
|
|
|
+ This is done by writing -1 in /proc/sys/kernel/sched_rt_runtime_us.
|
|
|
+
|
|
|
+
|
|
|
+4.2 Task interface
|
|
|
+------------------
|
|
|
+
|
|
|
+ Specifying a periodic/sporadic task that executes for a given amount of
|
|
|
+ runtime at each instance, and that is scheduled according to the urgency of
|
|
|
+ its own timing constraints needs, in general, a way of declaring:
|
|
|
+ - a (maximum/typical) instance execution time,
|
|
|
+ - a minimum interval between consecutive instances,
|
|
|
+ - a time constraint by which each instance must be completed.
|
|
|
+
|
|
|
+ Therefore:
|
|
|
+ * a new struct sched_attr, containing all the necessary fields is
|
|
|
+ provided;
|
|
|
+ * the new scheduling related syscalls that manipulate it, i.e.,
|
|
|
+ sched_setattr() and sched_getattr() are implemented.
|
|
|
+
|
|
|
+
|
|
|
+4.3 Default behavior
|
|
|
+---------------------
|
|
|
+
|
|
|
+ The default value for SCHED_DEADLINE bandwidth is to have rt_runtime equal to
|
|
|
+ 950000. With rt_period equal to 1000000, by default, it means that -deadline
|
|
|
+ tasks can use at most 95%, multiplied by the number of CPUs that compose the
|
|
|
+ root_domain, for each root_domain.
|
|
|
+
|
|
|
+ A -deadline task cannot fork.
|
|
|
+
|
|
|
+5. Tasks CPU affinity
|
|
|
+=====================
|
|
|
+
|
|
|
+ -deadline tasks cannot have an affinity mask smaller that the entire
|
|
|
+ root_domain they are created on. However, affinities can be specified
|
|
|
+ through the cpuset facility (Documentation/cgroups/cpusets.txt).
|
|
|
+
|
|
|
+5.1 SCHED_DEADLINE and cpusets HOWTO
|
|
|
+------------------------------------
|
|
|
+
|
|
|
+ An example of a simple configuration (pin a -deadline task to CPU0)
|
|
|
+ follows (rt-app is used to create a -deadline task).
|
|
|
+
|
|
|
+ mkdir /dev/cpuset
|
|
|
+ mount -t cgroup -o cpuset cpuset /dev/cpuset
|
|
|
+ cd /dev/cpuset
|
|
|
+ mkdir cpu0
|
|
|
+ echo 0 > cpu0/cpuset.cpus
|
|
|
+ echo 0 > cpu0/cpuset.mems
|
|
|
+ echo 1 > cpuset.cpu_exclusive
|
|
|
+ echo 0 > cpuset.sched_load_balance
|
|
|
+ echo 1 > cpu0/cpuset.cpu_exclusive
|
|
|
+ echo 1 > cpu0/cpuset.mem_exclusive
|
|
|
+ echo $$ > cpu0/tasks
|
|
|
+ rt-app -t 100000:10000:d:0 -D5 (it is now actually superfluous to specify
|
|
|
+ task affinity)
|
|
|
+
|
|
|
+6. Future plans
|
|
|
+===============
|
|
|
+
|
|
|
+ Still missing:
|
|
|
+
|
|
|
+ - refinements to deadline inheritance, especially regarding the possibility
|
|
|
+ of retaining bandwidth isolation among non-interacting tasks. This is
|
|
|
+ being studied from both theoretical and practical points of view, and
|
|
|
+ hopefully we should be able to produce some demonstrative code soon;
|
|
|
+ - (c)group based bandwidth management, and maybe scheduling;
|
|
|
+ - access control for non-root users (and related security concerns to
|
|
|
+ address), which is the best way to allow unprivileged use of the mechanisms
|
|
|
+ and how to prevent non-root users "cheat" the system?
|
|
|
+
|
|
|
+ As already discussed, we are planning also to merge this work with the EDF
|
|
|
+ throttling patches [https://lkml.org/lkml/2010/2/23/239] but we still are in
|
|
|
+ the preliminary phases of the merge and we really seek feedback that would
|
|
|
+ help us decide on the direction it should take.
|